HMP Oakwood CCTV drainage survey

Male Trust worker wearing a branded orange hi-vis jacket, white hard hat and safety glasses looking at a CCTV drainage monitor in the back of a company van.

Project name: HMP Oakwood CCTV drainage survey
Client name: Dynamic FM Ltd
Location: HMP Oakwood, Wolverhampton
Date: December 2025 - July 2026
Value: £60k


The challenge

The operator of HMP Oakwood in Wolverhampton needed a detailed map and condition report of their drainage system, so they could keep on top of current and future maintenance needs at the prison. Our client, Dynamic FM, brought us on board to help, as we already support them on a range of prison drainage projects across the country.

The role we played

Acting as a specialised and approved drainage contractor, we worked alongside Dynamic FM, the Ministry of Justice and Cushman & Wakefield consultant engineers. Over seven months, we carried out comprehensive CCTV drainage surveys. Our biggest challenge was the secure environment, with our teams needing to work in close proximity to the prisoners. To overcome this, we had escorts at all times and carefully scheduled work around lock-up periods.

The impact we made

We provided the prison operator with a detailed dilapidation report of the drainage network serving HMP Oakwood. This also included a full summary of recommended repairs and a detailed map of their entire drainage network, which they’d never had access to before. This new level of clarity and visibility is enabling them to prioritise maintenance work and plan for the future, and we’ve received positive feedback not just from our client, but from all parties involved.


“We had really positive feedback, not just from our client, but from everyone involved.”

– Wayne Martin, Drainage Director, Trust